EV charging

Coordinate vehicles, parking and power.

A charging project is an operating system for a site. Charger mix, dwell time, circulation and electrical capacity must be considered together.

Where it fits

Workplaces, destinations, commercial parking, fleet depots and mixed-energy sites considering staged charging deployment.

Inputs we need

  • Vehicle types and daily movement
  • Parking layout and dwell time
  • Existing electrical capacity
  • Charging speed and expansion plan

What we structure

  • AC and DC charger mix
  • Distribution and load management
  • Civil and installation interfaces
  • Solar and storage integration options

Design for the next vehicle, not only the first charger.

A phased electrical plan can reduce rework as a fleet or site expands. The initial brief should include the expected future state.